Company Profile
Press-centre
Services
Cooperation
Supply
Products
Subscribe
Dealers
New products
Basket
Basket is empty  
 
Поиск
Foundry Plant
Authorization
ChTZ-Uraltrac / Production / Foundry Plant
lit_223

The foundry plant is a part of the renowned association "ChTZ-Uraltrac", Ltd. In the April of 1933 the foundry plant of ChTZ produced its first castings for a tractor.

After the special shop start-up where the advanced casting methods are applied (metal melting in the induction furnaces, chill casting, casting under high and low pressure, casting by the consumable patterns) the foundry shop developed into the foundry plant.

The planned production capacity of the foundry plant is 133 thousands tons of castings per a year; and the working area comes to 57883 square meters.

It also comprises the service shops: mold-making and drop hammer shops.

The equipment as well as the skilled and experienced engineers and labors allow to produce the high-grade castings in quantity exceeding 1600 designations for the ChTZ needs, for deliveries in Russia and for export.

We enlarge the foundry production volume as well as develop the advanced casting methods. In 2002 we were granted with the Certificate of Conformance ИС 09001-96.

The foundry plant of "ChTZ-Uraltrac" Ltd comprises five main shops:

cast-iron
steel casting
non-ferrous casting
precision (steel) casting
На предыдущую страницу Наверх
Rambler's Top100